Paper sigradi2013_95:
Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras

Cumulative Index of Computer Aided Architectural Design
in Spanish

Works

Welcome guest _anon_892922

id sigradi2013_95
authors Santos de Andrade, Ludmila; Neander Furtado Silva; Ecilamar Maciel de Lima; Igor Monteiro
year 2013
title Os Sistemas BIM e a Redução de Inexatidões e Tempo nas Obras Públicas Brasileiras
source SIGraDi 2013 [Proceedings of the 17th Conference of the Iberoamerican Society of Digital Graphics - ISBN: 978-956-7051-86-1] Chile - Valparaíso 20 - 22 November 2013, pp. 284 - 287
summary The creation of an algorithm that will allow the quantitative accuracy of inputs, related to the Brazilian reality, inside the BIM platform will cause a decrease of the public costs of work. However, in this article only focus on how you can modify internally the BIM system platform for achieving the quantitative goals in planning materials. The new tool of construction planning and scheduling when using BIM systems's contribution, through the external database, will provide the construction control based on composition of inputs along the time that will allow a more economical execution to ensure the efficiency of public buildings.
keywords Algorithm; Accuracy of inputs; BIM; Database; Planning; Scheduling; Public buildings
series SIGraDi
email lud.de.andrade.08@gmail.com
content file.pdf (535,001 bytes)
discussion No discussions. Post discussion ...
ratings
last changed 2014/05/24 20:18
 
© CUMINCAD 2004