Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: convr-2013-25
Paper title: Effective project scheduling under workspace congestion and workflow disturbance factors
Authors: Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V
Summary: Effective project management implies the use of advanced planning and scheduling methods that allow to determine the feasible sequences of activities and to complete a project on time and on budget. Traditional scheduling tools like fundamental Critical Path Method (CPM) and various methods for Resource Constrained Project Scheduling Problem (RCPSP) and Time Constrained Project Scheduling Problem (TCPSP) have many shortcomings for the construction projects where spatial factor plays critically important role. Previously taken attempts to interpret space as a specific resource were successful for particular problems of line-of-balance scheduling, space scheduling, dynamic layout planning, horizontal and vertical logic scheduling, workspace congestion mitigating, scheduling multiple projects with movable resources, spatial scheduling of repeated and grouped activities, motion planning. However, none of these methods considers the spatio-temporal requirements in a holistic framework of generic RCPSP problem and provides feasible results accounting for workspace and workflow factors. In the paper we start with the classical RCPSP statement and then present mathematically strong formalization of the extended generalized problem taking into account workspace congestion and workflow disturbance constraints specified in practically meaningful and computationally constructive ways. For the generalized RCPSP problem an effective scheduling method is proposed. The method tends to minimize the project makespan while satisfying timing constraints and precedence relations, not exceeding resource utilization limits, avoiding workspace congestion and keeping workflows continuous. The method reuses so-called serial scheduling scheme and provides for additional computational routines and heuristic priority rules to generate feasible schedules satisfying all the imposed requirements. Advantages of the method and prospects for its application to industrial needs are outlined in the paper too.
Type: paper
Year of publication: 2013
Keywords: planning and scheduling,resource-constrained project scheduling problem,priority rules,4D modeling,workspace management
Series: convr:2013
Download paper: /pdfs/convr-2013-25.pdf
Citation: Semenov V,Anichkin A,Morozov S,Tarlapan O,Zolotov V (2013). Effective project scheduling under workspace congestion and workflow disturbance factors. CONVR 2013, http://itc.scix.net/paper/convr-2013-25
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]