Paper title: Construction Delay and Disruption Claims Assisted Through BIM Technology
Authors: Ageliki Valavanoglou, Danijel Rebolj and Detlef Heck
Summary: Construction projects are frequently subjected to delay and disruption leading to dispute between project participants regarding the entitlement to compensation. Challenges associated with the analysis of delay and disruption and the subsequent preparation of the claim conducted by a forensic analysis expert include the difficult retrieval of scattered, unstructured information and lack of adequate documentation, leading to weak analysis and therefore insufficient proof of causation and entitlement.This paper illustrates the chronological information generation regarding delay and disruption in the construction phase proposing a framework based on Building Information Modelling and structured information integration, to facilitate easy filing and retrieval of relevant documentation for claim preparation.
Type: regular paper
Year of publication: 2017
Keywords: Delay and Disruption Claims, Documentation, Forensic Analysis, Building Information Modelling, BIM Collaboration Format
Series: jc3:2017
Download paper: /pdfs/LC3_2017_paper_192.pdf
Citation: Ageliki Valavanoglou, Danijel Rebolj and Detlef Heck (2017). Construction Delay and Disruption Claims Assisted Through BIM Technology. Lean and Computing in Construction Congress (LC3): Volume I Ð Proceedings of the Joint Conference on Computing in Construction (JC3), July 4-7, 2017, Heraklion, Greece, pp. 391-398, http://itc.scix.net/paper/lc3-2017-192
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]