Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-1997-23
Paper title: Productivity and cost analysis based on a 4d model
Authors: Akinci B, Staub S, Fischer M
Summary: Four-dimensional (4D) CAD models are being used more and more frequently tovisualize the transformation of space over time. To date, these models are mostlypurely visual models. Any evaluation of a 4D model, e.g., whether it presents aworkable construction sequence, is left to the viewer. The evolution of 4D CADdemonstrates the ability to provide a tighter link between visualization andanalysis tools. In this paper, we discuss how an intelligent 4D model helpsidentify time-space conflicts between concurrent activities and provide assistancein calculating more realistic cost estimates. The 4D system (4D Work Planner)presented here is based on symbolic and graphic product and process models, andprovides both the visual and analytical feedback necessary to reengineerconstruction sequences.
Type:
Year of publication: 1997
Series: w78:1997
ISSN: 2706-6568
Download paper: /pdfs/w78-1997-23.content.pdf
Citation: Akinci B, Staub S, Fischer M (1997). Productivity and cost analysis based on a 4d model. Drogemuller R (editor); International council for building research studies and documentation. workshop (1997, Cairns) Information technology support for construction process reengineering Proceedings of CIB workshop - w78 “Working commission on information technology in construction” and tg10 “Task group on computer representation of design standards and building codes”, Cairns, Queensland, Australia, July 9th-11th, 1997; ISBN 086-443-636X (ISSN: 2706-6568), http://itc.scix.net/paper/w78-1997-23
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]