Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-1999-2386
Paper title: An automated model for generating a short-interval schedule
Authors: Waly A F, Thabet W Y, Wakefield R R
Summary: Many problems occur on the construction site during the execution of theproject. Some of these problems are due to a lack of detailed planning andscheduling. Although Short-Interval Scheduling (SIS) has proven to be auseful technique in managing the day-to-day work at the construction site,this technique is not extensively used. One of the reasons for this is the timeconsumed in the development of these schedules. This paper discusses thebenefits of Short-Interval Schedules. Current manual SIS formats arepresented. The paper introduces an automated model that will allow for thegeneration of Short-Interval Schedules.
Type:
Year of publication: 1999
Series: w78:1999
ISSN: 2706-6568
Download paper: /pdfs/w78-1999-2386.content.pdf
Citation: Waly A F, Thabet W Y, Wakefield R R (1999). An automated model for generating a short-interval schedule. Lacasse M A, Vanier D J (ed.); Information technology in construction, volume 4, ISBN 0-660-17743-9; Vancouver, May 30 - June 3, Canada (ISSN: 2706-6568), http://itc.scix.net/paper/w78-1999-2386
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]