Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2000-917
Paper title: Project management system for small-medium building construction project
Authors: Sunaga N, Nakamura H, Okazawa T
Summary: "Recently there are few big building construction projects in Japan, and it is accordingly a very important matter for general contractors how to get more efficiency in small-medium scale projects. The target of IT tool developments for construction project management has been shifted gradually form big projects to small-medium projects. Targeting at the project management of small-medium scale building construction, This paper describes the objectives, a methodology of IT-enabled process innovation.From an IT viewpoint, this paper discusses the following present states of small-medium construction projects in Japan; the problems that project managers are facing, and the characteristics of construction process. And this paper presents two case studies at construction sites to investigate the applicability of IT to construction processes. In the first case study, implementation of IT tools in construction processes is promoted. IT tools refer to the followings; several in-house management software, graphic software, 3D-CAD, e-mail, www, digital camera, web-camera, wireless LAN and so on. From this try, the methodology of categorization of project information is considered. The author himself worked as one of project managers in this construction project, consequently he had two roles both as a development staff and as a user of IT tools. So some empirical approach is included in this consideration. In the second case study, focusing on logistics, an Extranet is constructed among a general contactor and sub-contractors in order to share project data (ex. drawings or schedule .etc), to check on work progress with jobsite web-cameras from remote offices, to adjust schedules of incoming building materials. Through this experiment, possibility of IT-enabled process innovation is explored.In conclusion, this paper proposes a methodology of IT-enabled process innovation that derived from above studies, and describes the concept and the system composition of an Extranet saver for project management based on it."
Type:
Year of publication: 2000
Series: w78:2000
ISSN: 2706-6568
Download paper: /pdfs/w78-2000-917.content.pdf
Citation: Sunaga N, Nakamura H, Okazawa T (2000). Project management system for small-medium building construction project. Construction Information Technology 2000. Taking the construction industry into the 21st century.; ISBN 9979-9174-3-1; Reykjavik, Iceland, June 28 - 30, 2000 (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2000-917
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]