Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2002-19
Paper title: Determination of effects of modifications during planning processes
Authors: Heinrich T, Huhnt W
Summary: Usually, the co-ordination of design and planning tasks of a project in theconstruction industries is done in a paper based way. Subsequent modificationshave to be handled manually. The effects of modifications cannot be determinedautomatically. The approach to specify a complete process model before projectstart does not consider the requirements of the construction industries. The effort ofspecification at the beginning and during the process (modifications) does notjustify the use of standard process model techniques.A new approach is presented in this paper. A complete process model is deductedon the base of a core. The core consists of process elements and relations betweenthem. Modifications need to be specified in the core only. The effort of specificationis therefore reduced. The deduction of the complete process is based on the graphtheory. Algorithms of the graph theory are also used to determine the effects ofmodifications during the project work.
Type:
Year of publication: 2002
Series: w78:2002
ISSN: 2706-6568
Download paper: /pdfs/w78-2002-19.content.pdf
Citation: Heinrich T, Huhnt W (2002). Determination of effects of modifications during planning processes. Agger K (ed.); Distributing knowledge in building; Arhus, June 12 - 14, Denmark (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2002-19
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]