Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2003-1
Paper title: A computer model for selecting equipment for earthmoving operations using queuing theory
Authors: Alkass S, El-Moslmani K, AlHussein M
Summary: This paper presents a computer model “FLSELECTOR” for equipment fleet selection for earthmoving operations. The methodology based on the queuing theory is incorporated in a computer module to account for the uncertainties in that are normally associated with the equipment selection process. FLSELECTOR is capable of assisting the users in making decisions required for earthmoving operations, such as determining the size and number of trucks and excavators, haul road lengths and surface conditions, etc…These decisions are based on the calculated output for all feasible fleets. An actual case study is presented in order to illustrate the effectiveness and performance of the FLSELECTOR in comparison with the simulation method
Type:
Year of publication: 2003
Series: w78:2003
ISSN: 2706-6568
Download paper: /pdfs/w78-2003-1.content.pdf
Citation: Alkass S, El-Moslmani K, AlHussein M (2003). A computer model for selecting equipment for earthmoving operations using queuing theory. Amor R (editor) Proceedings of the CIB W78's 20th International Conference on Construction IT, Construction IT Bridging the Distance, CIB Report 284, ISBN 0-908689-71-3, Waiheke Island, New Zealand, 23-25 April 2003, pg. 1-8. (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2003-1
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]