Paper title: Linking up versus Breaking down: Demands on Cost Estimating for Turn-key Construction Projects
Authors: P Racky
Summary: The complete monetary valuation of interfaces between the various building elements or work packages is a substantial success factor for a correct estimate that takes account of all costs of turn-key construction projects. The estimating processes employed by construction contractors often neglect systematic interface analysis what leads to incorrect results. This paper sketches out an interface-oriented estimating approach. This approach will lead to a procedure in which the building elements to be costed are structured in a way that corresponds to their functional logic. As result a linked-up procedure, such as is necessary to cope with complex systems, will be achieved and a complete costing made easier.
Type: keynote paper
Year of publication: 2005
Series: w78:2005
ISSN: 2706-6568
Download paper: /pdfs/w78-2005-KN-w1-2-Racky.pdf
Citation: P Racky (2005). Linking up versus Breaking down: Demands on Cost Estimating for Turn-key Construction Projects. (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2005-kn-w1-2-racky
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]