Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2008-4-07
Paper title: IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS
Authors: R. K. Shah, N. Dawood
Summary: Innovative visualization technology applied to construction simulation and optimization has the potential to improve communications and coordination amongst the project stakeholders. In this context and in the drive for innovation in construction management, this paper introduces a framework of a 4D prototype for the automatic generation of visual terrain surfaces during earthwork construction processes. The framework has been designed and developed by integrating road design data, quantities of cut and fill, productivity models, algorithms for modelling terrain profiles and a road profile visualiser. The paper details the prototype of 4D visualization model (4DVM) that has been designed and developed in this research using innovative methodology where 4D models of terrain surfaces are generated based on coordinate data and the productivity of earthwork. The model has been demonstrated with a case study that was used to validate the model. The 4DVM is intended to assist project planners/construction managers in logical decision making processes for construction scheduling and resource planning. It will also improve the communication gap amongst the construction team and consequently improve site coordination and operations.
Type: normal paper
Year of publication: 2008
Keywords: Earthwork operations, innovative methodology, road profile generation, schedule communication, 4D visualization model (4DVM)
Series: w78:2008
ISSN: 2706-6568
Download paper: /pdfs/w78-2008-4-07.pdf
Citation: R. K. Shah, N. Dawood (2008). IMPROVING COMMUNICATION OF SCHEDULING INFORMATION OF EARTHWORK CONSTRUCTION PROCESS USING 4D VISUALISATION MODEL IN ROAD PROJECTS. CIB W78 2008 - Improving the management of construction projects through IT adoption (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2008-4-07
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]